Final Report of the COST-247 Action |
Enhancement to LOTOS, status and progression of work
Juan Quemada
Dept. Ingenieria de Sistemas Telematicos |
Universidad Politecnica de Madrid |
ETSI Telecomunicacion |
E-28040 Madrid |
Spain |
Tel: +34 1 3367331 |
Fax: +34 1 3367333 |
E-mail: jquemada@dit.upm.es |
Overview of the requirements on E-LOTOS and of the different enhancements being considered in the ISO Work Item. This general overview of the status of E-LOTOS may provoke reflections of general nature. The enhaments being considered are: - Generalized operators. Generalization of termination and enabling to provide an exception handling mechanism and generalization of disabling to provide a suspend/resume operator. - Event structure. Constructs for typing and tagging gates are considered. The introduction of partial synchronization among events is also considered in the new framework. - The introduction of time is considered by adding the notion of time passing. - The introduction of a new data definition part which is executable and which has a rich set of predefined types is considered. - The introduction of modules is considered. - The introduction of mobility is considered.
This presentation has been given during the COST-247 4th Management Committee Meeting (Berlin, Germany, February 9--10, 1995).
COST-247 Working Group(s): 1
Web Links:http://www.dit.upm.es/~quemada/
This Page was prepared by Mark Jorgensen.